Holistic energy supply for companies - reduce costs and achieve climate targets
Holistic energy supply for companies - reduce costs and achieve climate targets
Optimize your energy consumption with AI-driven power supply, energy management software, battery storage and steering solutions.
Optimize your energy consumption with AI-driven power supply, energy management software, battery storage and steering solutions.
Annual recurring reduction of electricity costs through AI-supported purchase optimization, peak load management, and battery storage.
The context
What changes will there be for commercial storage systems in 2026?
Already in force
Many storage facilities are still exempt from grid charges today. AgNes is set to reorganise the rules in future.
Section 118(6) of the Energy Industry Act (EnWG)
Since 1 January 2026
New rules also apply to storage systems under the energy tax. The same logic applies; second component.
Third Amendment Act to theStromStG
Planned from 1 October 2026
Charging from the grid and feeding PV electricity into the grid, with greater flexibility for self-consumption and selling surplus electricity.
MiSpeL definition · Section 19(3b)/(3c) of the EEG
Expected by the end of 2026
Anyone who makes a final decision before the new rules come into force and commences operations by 4 August 2029 may retain the current grid tariff rules.
AgNes · Overall concept of the Federal Network Agency
As at 17 August 2026. The MiSpeL decision is available as a working draft dated 5 August 2026 and is not yet legally binding. Details of the decision →
For your site
What does this mean for a business with a solar PV system and large-scale storage?
01
One storage system, multiple savings
Self-consumption, optimising grid procurement, subsidised renewable energy sales and arbitrage are no longer mutually exclusive. There is no longer any need to commit to a single use, and with that goes part of your previous payback calculation.
02
Clear allocation rather than double charging
Feed-in and off-take are allocated on a pro rata basis every quarter of an hour. This makes it possible to determine which volumes of electricity are eligible for feed-in tariffs and which benefit from the levy exemption. This lays the foundation for multi-use and bidirectional charging during normal operation.
03
Grandfathering for early decisions until the end of 2026
Anyone who makes the final investment decision before the new AgNes grid tariff rules come into force and starts operations by 4 August 2029 will benefit from grandfathering under the current grid tariff rules. After that, AgNes will apply a capacity price, which is currently under discussion at between €4 and €7 per kW per year.
Potential Indicator
What are the benefits of mixed operation at your site?
To arrive at a reliable figure, there is one piece of information that no computer can replace: your load profile. It determines which operating modes are actually worthwhile at your site — and in what order.
Success stories of our customers
Wein- und Sektkellerei Jakob Gerhardt reduces energy costs by 23%
How we calculate this
trawa provides access to the methods used by large, energy-intensive corporations to manage their electricity procurement: energy supply, energy management software and the flexible control of energy systems – all from a single source. In combination with a battery storage system, this can reduce electricity costs by up to 40 per cent.
Over 450 companies in Germany and Austria
We market storage capacity ourselves – not just consultancy
Analysis based on your quarter-hourly data, not on standard load profiles
The decision must be made before the rule change, not after.
We will calculate the emissions from combined operation at your site — and by when you need to make a decision in order to retain the current grid tariff rules.
FAQ – Frequently Asked Questions
What does MiSpeL regulate?
When does MiSpeL come into force?
Who is MiSpeL relevant for?
What changes with mixed operation?
Do I need a new metering system?
What will happen to my EEG subsidy?
By when must the storage facility be operational?
Is it now more worthwhile to have a storage system through MiSpeL?
What is meant by electricity procurement for industrial companies?
What is the difference between a fixed-price contract and a procurement portfolio?
What procurement options are available to industrial companies?
How does AI-powered electricity procurement work?
At what level of annual consumption does professional electricity procurement become worthwhile?
How long does it take to switch to trawa?
How much does it cost to source electricity through trawa?












